:quality(80))
Why more BIM isn't always better
In discussions about BIM, digital maturity is often seen as a measure of progress: the more data, the more integrated the models and the greater the connectivity. However, Heatherwick Studio takes a different view. Three architectural projects in China, Colombia, and the United States demonstrate why the most advanced level of BIM is not necessarily the best choice, and why finding the right digital strategy is more important.

:quality(80))